1974 Datsun 260z


Day 41 - May 26, 2015

Finished tensioner pulley brackets.

RD 15-05-26 (1).jpg
RD 15-05-26 (2).jpg
RD 15-05-26 (3).jpg

Day 42 - May 29, 2015

Welded up holes in firewall, and floor. Welded on upper seat belt mount.

RD 15-05-29 (1).jpg
RD 15-05-29 (2).jpg
RD 15-05-29 (3).jpg
RD 15-05-29 (4).jpg
RD 15-05-29 (5).jpg
RD 15-05-29 (6).jpg
RD 15-05-29 (7).jpg

Day 43 - May 31, 2015

Denny welded seat. Test fit the air intake mold.

RD 15-05-29 (8).jpg

Day 44 - June 1, 2015

Made battery box. Continued working on coil brackets. Welded on water pump mounts.

RD 15-06-01 (1).jpg
RD 15-06-01 (2).jpg
RD 15-06-01 (3).jpg
RD 15-06-01 (4).jpg
RD 15-06-01 (5).jpg
RD 15-06-01 (6).jpg
RD 15-06-01 (7).jpg
RD 15-06-01 (8).jpg
RD 15-06-01 (9).jpg

Day 45 - June 2, 2015

Finished Coil mounts. Made fuel pump mounting brackets. Curt began welding oil pan.

RD 15-06-02 (1).jpg
RD 15-06-02 (2).jpg
RD 15-06-02 (3).jpg
RD 15-06-02 (4).jpg
RD 15-06-02 (5).jpg
RD 15-06-02 (6).jpg
RD 15-06-02 (7).jpg

Day 46 - June 3, 2015

Made blow of valve piping. Plumbed inlet to fuel filter/regulator.

RD 15-06-03 (1).jpg
RD 15-06-03 (2).jpg
RD 15-06-03 (3).jpg
RD 15-06-03 (4).jpg
RD 15-06-03 (5).jpg
RD 15-06-03 (6).jpg
RD 15-06-03 (7).jpg
RD 15-06-03 (8).jpg
RD 15-06-03 (9).jpg

Day 47 - June 4, 2015

Dave finished air intake mold. Finished fuel return line. Began making water manifold. 

RD 15-06-04 (1).jpg
RD 15-06-04 (2).jpg
RD 15-06-04 (3).jpg
RD 15-06-04 (4).jpg
RD 15-06-04 (5).jpg
RD 15-06-04 (6).jpg
RD 15-06-04 (7).jpg
RD 15-06-04 (8).jpg
RD 15-06-04 (9).jpg

Day 48 - June 7, 2015

Mounted PCM.

RD 15-06-07 (1).jpg

Day 49 - June 12, 2015

Modified and installed water bleeder lines. Tapped intake to accept air charge temperature sensor. 

RD 15-06-12 (1).jpg
RD 15-06-12 (2).jpg

Day 50 - June 13, 2015

Began running turbo oil feed. Modified stainless steel fittings and line to make fuel rail feed and pressure gauge port.

RD 15-06-13 (1).jpg
RD 15-06-13 (2).jpg
RD 15-06-13 (3).jpg
RD 15-06-13 (4).jpg
RD 15-06-13 (5).jpg