1974 Datsun 260z
Day 41 - May 26, 2015
Finished tensioner pulley brackets.
Day 42 - May 29, 2015
Welded up holes in firewall, and floor. Welded on upper seat belt mount.
Day 43 - May 31, 2015
Denny welded seat. Test fit the air intake mold.
Day 44 - June 1, 2015
Made battery box. Continued working on coil brackets. Welded on water pump mounts.
Day 45 - June 2, 2015
Finished Coil mounts. Made fuel pump mounting brackets. Curt began welding oil pan.
Day 46 - June 3, 2015
Made blow of valve piping. Plumbed inlet to fuel filter/regulator.
Day 47 - June 4, 2015
Dave finished air intake mold. Finished fuel return line. Began making water manifold.
Day 48 - June 7, 2015
Mounted PCM.
Day 49 - June 12, 2015
Modified and installed water bleeder lines. Tapped intake to accept air charge temperature sensor.
Day 50 - June 13, 2015
Began running turbo oil feed. Modified stainless steel fittings and line to make fuel rail feed and pressure gauge port.