Day 41 - August 19, 2008

Steering linkage was completed. Seat mounts were completed.

2008-08-19 (1).jpg

Day 42 - August 20, 2008

Jason finished welding up hood. Safety net brackets were mounted. Role bar gussets were mounted. Steering wheel was reinstalled. Floor boards were patched. Seat belt mounts were mounted.

Day 43 - August 21, 2008

Trunk lid was put back on car. Front floor was painted. Rotors were removed. Jason sanded first coat of bondo on hood.

2008-08-21 (1).jpg

Day 44 - August 22, 2008

Terry cut rotors. Calvin made the right side dash firewall panel. Cross member was cleaned primed and painted by Paula.

2008-08-22 (1).jpg

Day 45 - August 23, 2008

Brake pedal was finished. Master cylinder was mounted. Gas pedal was fabricated and mounted. Front brake disks were cleaned and remounted. Seat was reinstalled. Body work on hood was finished by Jason. Transmission dip stick tube was fixed. Terry mounted slicks.

2008-08-23 (1).jpg
2008-08-23 (2).jpg
2008-08-23 (3).jpg
2008-08-23 (4).jpg
2008-08-23 (5).jpg
2008-08-23 (6).jpg
2008-08-23 (7).jpg

Day 46 - August 24, 2008

Hood was primed. Engine and transmission were reinstalled. Hood was painted.

2008-08-24 (1).jpg
2008-08-24 (2).jpg
2008-08-24 (3).jpg
2008-08-24 (4).jpg
2008-08-24 (5).jpg
2008-08-24 (6).jpg
2008-08-24 (7).jpg
2008-08-24 (8).jpg
2008-08-24 (9).jpg
2008-08-24 (10).jpg
2008-08-24 (11).jpg
2008-08-24 (12).jpg
2008-08-24 (13).jpg
2008-08-24 (14).jpg

Day 47 - August 25, 2008

Sway bar was clearanced inside the front jack point. Upper A-arms and upper ball joints were modified. Front suspension was installed.

2008-08-25 (1).jpg
2008-08-25 (2).jpg
2008-08-25 (3).jpg
2008-08-25 (4).jpg
2008-08-25 (5).jpg
2008-08-25 (6).jpg

Day 48 - August 26, 2008

Exhaust was installed. Drive shaft safety loop was installed. Shifter was installed. Rear interior panels were made, polished, flamed, painted, outlined, and installed. Fuel cell shield was painted. Main fuel line was installed. Fuel pump was installed.

2008-08-26 (1).jpg
2008-08-26 (2).jpg
2008-08-26 (3).jpg
2008-08-26 (4).jpg
2008-08-26 (5).jpg
2008-08-26 (6).jpg

Day 49 - August 27, 2008

Fuel filter was installed. Main fuel line was routed over rear through a piece of bent tubing. Fuel lines were connected. Carburator was bolted in place. Throttle linkage was fabricated. Brake lines were begun. Trunk latch was installed.

2008-08-27 (1).jpg
2008-08-27 (2).jpg
2008-08-27 (3).jpg
2008-08-27 (4).jpg
2008-08-27 (5).jpg
2008-08-27 (6).jpg
2008-08-27 (7).jpg
2008-08-27 (8).jpg

Day 50 - August 28, 2008

Drive shaft was installed. Brake lines were finished. Shifter linkage connected. David Nelson (Andy's brother) came up from Maryland and saw the bug for the first time.

2008-08-28 (1).jpg
2008-08-28 (2).jpg
2008-08-28 (3).jpg
2008-08-28 (4).jpg
2008-08-28 (5).jpg